Projects
 

Transmission Corporation of Andhra Pradesh Limited (AP TRANSCO)

  • Transact Survey, Route Alignment, Tower Spotting, Detailed Survey, Sag Profiling and Check Survey
  • Design, Fabrication and Supply of Transmission Towers
  • Erection, Inspection and Testing of Transmission Towers
  • Transmission Line construction, Testing and Commissioning
  • Turnkey EPC of Substations up to 220 kV
  • Turnkey EPC of Bay Extensions works up to 220 kV
 

Transmission Corporation of Telangana Limited
(TS TRANSCO)

  • Transact Survey, Route Alignment, Tower Spotting, Detailed Survey, Sag Profiling and Check Survey
  • Design, Fabrication and Supply of Transmission Towers
  • Erection, Inspection and Testing of Transmission Towers
  • Transmission Line construction, Testing and Commissioning
  • Turnkey EPC of Substations up to 220 kV
  • Turnkey EPC of Bay Extensions works up to 220 kV
 
T&D is an managed by dedicated professionals with good knowledge & highly experienced  to address the changing needs of the Customers..

Our Transmission and Distribution includes:

  • Design and Supply of Transmission Towers
  • Transmission Line Construction
  • EHV Substations and Transmission Lines
  • Distribution Systems upto 33kV Levels.

Our Projects

 
SL No Name of the work done Customer Year
01 Liasoning with aptransco & apspdcl for synchronizing and getting open access permission of 18MW Thermal power plant to Grid. Supply, erection, testing and commissioning of Metering yard equipment, liasoning for KCP Cements Ltd 2013-2014
02 Supply, Construction, erection, testing and commissioning of 2 nos of 132kv bays in 132/33kv substation and 132kv LILO line APTRANSCO, ALAMPUR, Mahboobnagar Dt 2013-2014
03 Supply , erection,testing and commissioning of Metering yard equipment , liasoning for synchronizing, getting open access permission of 5.75MW Solar power plant to Grid KCP Cements Ltd 2013-2014
04 Supply , erection,testing and commissioning of Metering yard equipment , liasoning for synchronizing, getting open access permission of 35MW power plant to Grid Jaypee Balajee
Cements, ( a unit of JP Associates )
2013-2014
05 Liasoning work with aptransco for getting feasibility for grid connectivity of 50 MW power plant to aptransco substation Shan Solar Projects Ltd 2012- 2013
06 Liasoning work with aptransco for getting feasibility for grid connectivity of 50 MW power plant to aptransco substation Photon Solar Power Pvt Ltd 2012- 2013
07 Liasoning work with aptransco for getting feasibility for grid connectivity of 50 MW power plant to aptransco substation Sunnidhi Solar Power,
Hyderabaad
2012- 2013
08 Liasoning work with aptransco for getting feasibility for grid connectivity of 50 MW power plant to aptransco substation Orissa Power
Consortium Ltd
2012-2013
09 Liasoning work with aptransco for getting feasibility for grid connectivity of 50 MW power plant to aptransco substation NSL POWER 2012-2013
10 Liasoning work with aptransco for getting feasibility for grid connectivity of 50 MW power plant to aptransco substation Supply, Construction, erection, testing and commissioning of 132/33kv substation, 132kv Transmission Line Astha Power
Corporation, Hyderabaad
2012-2013
11 Supply, erection ,testing and commissioning of PLCC system for 132kv Transmission line, Construction of bay KIOSK room in 132/33kv Substation, for Control & Relay panel and Civil works in Metering and Menakuru Misc.works Hindustan
National Glass Industries Ltd NELLORE
2012-2013
12 Supply, Construction, erection, testing and commissioning of 132/33kv substation, 132kv Transmission Line Hindustan
National Glass
Industries Ltd,
2012-2013
13 Construction, erection, testing and commissioning of 132/33kv sub station Sugna Metals , Hyderabad 2012-2013
14 Supply, Construction, erection, testing and commissioning of 132/33kv sub station Sri Raghavendra Ferro Alloys 2011-12
15 Supply, Construction, erection, testing and commissioning of 132/33kv substation & 132 kv Transmission line SUCCESSFULLY CHARGED ON 06.06.2012 G S N Ferro Alloys 2011-12
16 Construction,   erection,  testing  and commissioning of 132/33KV substation. Vinayaka Steels 2011-2012
17 132 KV substation at tangutur 132 KV LILO line [2.85 km length] from tangutur to ongole. SUCCESSFULLY CHARGED ON 28.03,2012 AP Transco 2011-2012
18 Operation and Maintenance of 400 KV substations at MAMIDIPALLY, HYDERABAD AP Transco 2012-14
19 Operation and Maintenance of 132 KV substations at TAKKALAPALLY HYDERABAD AP Transco 2012-14
20 Operation and Maintenance of 132 KV substations IDPL at Hyderabad AP Transco 2012-14
21 Liasoning with CEIG for approval of 220kv substation and total plant drawings , arranging site inspection and getting total approval Sri Girija Power and Alloys (I) Pvt Ltd 2011-12
22 Liasoning with AP TRANSCO for sanction of 12.5 MVA at 132 kv potential for their plant at Nirmal, Adilabad Dt; KR Ferro Alloys 2011-2012
23 Liasoning with CEIG for approval of total plant drawings, arranging site inspection of CEIG and getting final load approval Sri Raghavendra Ferro Alloys 2011-12
24 Erection of 31-d 100 MVA Transformer and connected civil and electrical works GUDIWADA AP Transco 2011-12
25 Liasoning with CEIG for approval of total plant drawings, arranging site inspection of CEIG and getting final load approval G S N Ferro Alloys 2011-12
26 Liasoning with AP TRANSCO for sanction of 12.5 MVA at 132 kv potential for their plant at Chegunta, Medak Dt; G S N Ferro Alloys 2011-2012
27 Liasoning with CEIG for approval of total plant drawings, arranging site inspection of CEIG and getting fmal load approval Vinayaka Steels 2011-12
28 Liasoning with AP TRANSCO for sanction of 12.5 MVA at 132 kv potential
for their plant at Chegunta, Medak Dt;
Vinayaka Steels 2011-2012
29 Erection of 132/33KV bay extension works at 132 KV sub-stations at Narayankhed. AP Transco 2010-2011
30 Diversion & construction of 132 KV DC line from Ramgundam — Bellampalli [8KM] AP Transco 2009-2010
31 Rerouting of 132 KV DC line from Seetha­rampatnam to M/s. BPL Bhadrachalam AP Transco 2009-2010
32 Erection of 80 KVA Transformer at 220 KV Sub-station Chandrayanagutta. AP Transco 2009-2010
33 Erection 50 MVA transformer in place of 31.5 MVA at 132 KV/33KV Madhapur substation. AP Transco 2009-2010
34 Erection of 50 MVA Transformer in place of 31.5 MVA at 132 KV RC Puram Sub- station. AP Transco 2008-2009
35 Erection of 31.5 MVA Transformer in place of 10/16 MVA at 132/33KV Narasapur. AP Transco 2008-2009
36 Erection of 31d 100 MVA power transformer at 220/132KV minpur substation. AP Transco 2007-2008
37 Erection of 132 KV bay extension at 132 KV at Narayankhed substation. AP Transco 2007-2008
38 Maintenance of 132 KV substations IDPL at hyderabad AP Transco 2005-2006
39 132 KV bus sictionalisation at 132 KV substation at Bandlaguda, Hyderabad AP Transco 2008-2009
40 Replacement of 3 Nos. 220 KV MOCBs with SF6 breakers & renovation of 3 nos 220 KV bays at 220KV S.S. Shapurnagar AP Transco 2007-2008
41 Construction of section office at Sadasivapet APCPDCL 2007-2008
42 Construction of 33/11  KV  office   at Achanpally village APCPDCL 2007-2008
43 Erection of 33 KV /11KV substation at Regode, Almaipet, Shalipet, Venkatraopet, Minpur, Jogipet & Shivampet. APCPDCL 2006-2007
44 Conversion of switchyard & building of 33/11KV at Patancheru APCPDCL 2005-2006
45 Construction   of 33/11KV   substations  at above places, bays, capacitor bank, O&M section office etc. APCPDCL 2007-2008
46 Operation & maintenance of 33KV & 11KV lines Chanchalguda. APCPDCL 2007-2008
47 Operation & maintenance of 33KV & 11KV lines Sadasivapet. APCPDCL 2003-2004
48 Renovation and strengthening of existing earthing system of 50 MVA PTRs at 220 KV S'S' shapurnagar APCPDCL 2008-2009
49 Construction  of 33KV 11Km line construction of 11KV 8 km line, Malakram. APCPDCL 2004-2005
50 Construction of retaining wall and other in 33/11KV at Kista Reddypet APCPDCL 2006-2007
51 Construction OR 33kv Switchyard at Regode — Jogipet APCPDCL 2006-2007
52 Construction, operation & maintenance of 132 KV Medchal Gadwal line, Puttapahad­Kodangal, Minpur- Medak Line, Minpur — Nizam Sagar, Puttapahad DC & SC line, Kalwakurthy — Nagarkurnool DC / SC line, Kalwakurthy — Bhoothpur 220 KV DC line APCPDCL 2006-2007
53 Operation & maintenance of 33/11KV lines Nagarkurnool, Falaknuma substation. APCPDCL 2003-2004
54 Operation & maintenance of 132/33kv Substations at Erragadda,Dharmasagar, Kalwakurthy AP TRANSCO 2011-2012
55 Providing permanent Lighting at Shilparamam , Hyderabad Shilparamam Hyderabad 2011-2

Industrial Electrical Works

 
S.No. Name of the work done Customer Year
01 Industrial Electrical works incl. 1800 Amp Double Busbar PCC Flame proof equipment works. Shaw-wallace, Hospet, Karnataka 2001-02
02 Supply, erection & Commissioning of 11.4 km long 33KV HT Line and sub-station works. Sagar Power Ltd. Piduguralla (Mini Hydel Scheme) 2001-02
03 Supply, erection & commissioning of 11KV Sub-station, panels, electrical works and compressed airlines and 2x250 KVA DG sets. Lokesh Machine Tools, Hyderabad 2001-02
04 Industrial Election works, erection of 1000 KYA DG set and down steam electrics. Malhotra Shaving Products, Hyderabad 2001-02
05 Supply, Erection Commissioning of 33KV Sub-station and industrial works. Wipro Systems, Begumpet, Hyderabad. 2001-02
06 Drawing approvals, CEIG liasioning works Wipro Systems Begumpet, Hyderabad 2001-02
07 Supply erection testing & Commissioning of flame proof electrical works. Shaw-Wallace Hospet, Karnataka 2002-03
08 Electrical maintenance works (Industrial) Malhotra Shaving Products, Hyderabad. 2002-03
09 Supply and commissioning of 33 kv HT line Sagar Cements, Anakapalli 2001-02
10 Erection of Grain Spirit Equipment and Electrification works. Shaw-wallace, Hospet, Karnataka 2001-02
 